Question: 1

Scenario: A Citrix Architect needs to design a new XenApp and XenDesktop environment.
Currently, the environment is configured with two locations with identical XenDesktop Sites.
Each Site has two Delivery Controllers, two StoreFront servers, and one NetScaler high
availability pair. The same applications have been published from both Sites for all the users.
Two Zones (Zone A and Zone B) are configured in each Site with one Controller in each
zone. The Microsoft Exchange server is only accessible from Virtual Delivery Agent (VDA)
machines in Zone A in each Site.
The following access requirements have been identified:
• Users should have a single URL when accessing resources from different Sites.
• Users should always connect to the datacenter closest to their location.
• Applications added to Favorites within Citrix Receiver should be retained when accessed
from different Sites.
• Launched applications and desktops should always connect through a local NetScaler.
• No duplication of applications published from different Sites.
• Microsoft Outlook should always launch in Zone A.
The architect should recommend configuring Optimal Gateway routing on
___________across both locations to ensure that users connect through a local NetScaler.
(Choose the correct option to complete the sentence.)


A. Delivery Controllers
B. StoreFront servers
C. Global Server Load Balancing (GSLB) vServers
D. NetScaler appliances


Answer: B



Question: 2

Scenario: A Citrix Architect needs to design a new XenApp and XenDesktop environment.
While designing Universal Print server (UPS) for the customer, the architect is asked to
ensure that the UPS design can handle 500 simultaneous print jobs per minute.
What must the architect deploy to support the load estimated by the customer?


A. Two UPS servers and configure UPS for load balancing policy
B. Ten UPS servers and configure UPS for load balancing policy
C. Five UPS servers and configure NetScaler load balancing
D. Two UPS servers and configure NetScaler load balancing
E. Five UPS servers and configure UPS for load balancing policy
F. Ten UPS servers and configure NetScaler load balancing


Answer: E 



Question: 3

Scenario: A Citrix Architect is designing an environment for a large company. The company
has identified the following user groups and requirements.
• Product Managers - Typically, they work from inside the company network but are able to
work from home. They need to use a variety of standard productivity and web-based SaaS
applications.
• Field Sales Engineers - They frequently work with mobile devices and tend to access the
environment externally. They need access to sales tools and the front-end of the customer
database.
• Web Developers - Internal and remote workers who use specialized hardware with a
graphics card to handle resource-intensive applications.
Which FlexCast model should the architect assign to Web Developers?


A. VM Hosted Applications
B. Published Apps
C. Published Desktops
D. Hosted VDI


Answer: B 


Question: 4

A Citrix Architect needs to conduct a capabilities assessment for an organization that wants
to design and build a new XenApp and XenDesktop environment.
Which four capabilities will directly influence whether the existing Citrix administrative
team will have the capacity to support the new environment? (Choose four.)

A. Network architecture
B. Current backup solutions
C. Users and applications
D. Existing XenApp and XenDesktop environments
E. Training and certifications of support staff and users
F. Current storage solutions
G. Image management processes

Answer: A,C,D,F